Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SHETDrum of Clunas Wind and Solar Park
Drum of Clunas Wind and Solar Park is a 150 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Drum Of Clunas Wind 275Kv Substation, with capacity due from October 2031. The connection agreement is held by Broadhaven Distribution Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003970
- Customer
- Broadhaven Distribution Limited
- Technology
- Wind Onshore
- Total capacity
- 150 MW
- Change in this agreement
- +150 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Drum Of Clunas Wind 275Kv Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem