NESO TEC REGISTER · GREAT BRITAIN

Wind + storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown10613.6 GW in total
In planning97scoping or awaiting consent
Consented or building2closest to connecting
Built7connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

106 projects · page 2 of 3
ProjectCapacityStageConnection siteFrom
Aultmore Wind Farm (2023)
Wind + storage · Vattenfall Wind Power Ltd
105 MWScoping Aultmore Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Sep 2030
Eredine Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
105 MWScoping An Suidhe 275/33kV
SSEN Transmission (north Scotland)
Nov 2029
Ourack Wind Farm
Wind + storage · Ourack Wind Farm LLP
105 MWScoping Ourack Wind Farm 132/33 kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Mynydd Y Gwynt
Wind + storage · Edf Energy Renewables Limited
100 MWScoping Mid Wales Connection Node A 400Kv Substation
National Grid (England & Wales)
Oct 2037
Sleat Hybrid
Wind + storage · Galileo 13 Limited
100 MWScoping Broadford GSP
SSEN Transmission (north Scotland)
Oct 2034
Brunt Hill Wind Farm
Wind + storage · Brunt Hill Limited
99 MWAwaiting Consents Westfield 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Quintfall Forest Hybrid Wind and BESS 1
Wind + storage · Voltalia UK Ltd
99 MWScoping Gills Bay 132kV
SSEN Transmission (north Scotland)
Oct 2037
Glenvernoch
Wind + storage · Energyfarm UK Glenvernoch Ltd
96 MWScoping Glenvernoch 132kV
SP Transmission (south Scotland)
Oct 2037
South Kyle 2 Wind farm
Wind + storage · Vattenfall Wind Power Ltd
92 MWScoping South Kyle 2 132/33kV Substation
SP Transmission (south Scotland)
Jul 2030
Kyllachy Wind Farm
Wind + storage · Wind Estate (UK) Limited
91 MWScoping Tomatin 132kV Substation Extension
SSEN Transmission (north Scotland)
Oct 2037
Breackerie wind farm
Wind + storage · Energyfarm UK Breackerie Ltd
91 MWScoping Breackerie 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Rowan Wind Energyfarm
Wind + storage · Energyfarm Rowan LLP
91 MWScoping Rowan 275/33kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Edinbane Windfarm
Wind + storage · Vattenfall Wind Power Ltd
90 MWScoping Edinbane 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2033
Seat Hill Wind Farm
Wind + storage · Perigus Energy UK Limited
90 MWScoping Seat Hill 132kV Substation
SP Transmission (south Scotland)
Oct 2035
Woodcock Hill Wind Farm
Wind + storage · Perigus Energy UK Limited
90 MWScoping Woodcock Hill WF Substation
SSEN Transmission (north Scotland)
Oct 2032
Assel Valley Extension Wind Farm
Wind + storage · Renantis UK Limited
88 MWScoping Maybole GSP
SP Transmission (south Scotland)
Oct 2032
Acheilidh Wind Farm
Wind + storage · Energyfarm UK Acheilidh Ltd
84 MWScoping Acheilidh Wind farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Minnygryle Burn Energy Park
Wind + storage · Wind 2 Project 6 Limited
84 MWScoping Minnygryle Burn Energy Park 132kV substation
SP Transmission (south Scotland)
Oct 2036
Kirkan Wind Farm
Wind + storage · Kirkan Wind Farm Limited
82 MWScoping Corriemoillie 2 400/132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Caorach
Wind + storage · Invenergy Development UK Ltd
81 MWScoping Caorach 132 KV Substation
SSEN Transmission (north Scotland)
Oct 2033
Airds Hill Wind Farm
Wind + storage · Onpath Energy Limited
80 MWScoping Airds Hill WindFarm 132kV Substation
SP Transmission (south Scotland)
May 2031
Chesters
Wind + storage · Queequeg Renewables Ltd
80 MWScoping Teviot 400/132kV Substation
SP Transmission (south Scotland)
Oct 2033
Heathland Wind Farm
Wind + storage · Edf Energy Renewables Limited
80 MWScoping Heathland 132/33kV Substation
SP Transmission (south Scotland)
Sep 2028
Foel Fach Wind Farm
Wind + storage · Foel Fach Wind Farm Limited
79 MWScoping North Wales connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Tarvie Wind Farm
Wind + storage · Koehler Renewable Energy UK Limited
77 MWScoping Beauly substation 275KV
SSEN Transmission (north Scotland)
Oct 2033
Windburn
Wind + storage · Windburn Wind Farm Limited
75 MWScoping Braco West GSP
SSEN Transmission (north Scotland)
Oct 2035
Windburn Wind Farm
Wind + storage · Windburn Wind Farm Limited
75 MWScoping Devonside 132kV Substation
SP Transmission (south Scotland)
Oct 2034
Strath Oykel Wind Farm
Wind + storage · Energyfarm Strath Oykel LLP
74 MWAwaiting Consents Shin 1 GSP
SSEN Transmission (north Scotland)
Oct 2032
Leithenwater Wind Farm
Wind + storage · Leithenwater Wind Energy Hub Limited
73 MWScoping Galashiels 132/33kV
SP Transmission (south Scotland)
Apr 2030
Hunterston Wind Farm
Wind + storage · Galileo 01 Limited
70 MWScoping Hunterston 400/132kV
SP Transmission (south Scotland)
Apr 2033
Tinnisburn Wind Farm
Wind + storage · Baywa R.e. UK Limited
70 MWScoping Tinnisburn Wind Farm 132Kv Substation
SP Transmission (south Scotland)
Oct 2031
Enoch Hill
Wind + storage · RWE Renewables UK Onshore Wind Limited
69 MWBuilt Enoch Hill 132/33kV Substation
SP Transmission (south Scotland)
Greystone Knowe Windfarm
Wind + storage · Greystone Knowe Windfarm Limited
67 MWScoping Gala North 132Kv Substation
SP Transmission (south Scotland)
Oct 2033
Scawd Law Wind Farm
Wind + storage · Fred Olsen Renewables Limited
64 MWScoping Gala North 400/132kV Substation
SP Transmission (south Scotland)
Apr 2032
Divot Hill Wind Farm
Wind + storage · Energyfarm Divot Hill Ltd
63 MWScoping Divot Hill 132/33 kV Substation
SP Transmission (south Scotland)
Oct 2036
Blacklaw Extension
Wind + storage · Scottish Power Renewables (UK) Limited
60 MWBuilt Blacklaw Extension 132/33kV
SP Transmission (south Scotland)
Cloud Hill Windfarm
Wind + storage · Cloud Hill Windfarm Limited
60 MWScoping Glenglass 132/33kV
SP Transmission (south Scotland)
Oct 2036
Crakaig Wind Energy Hub
Wind + storage · Crakaig Wind Energy Hub Limited
60 MWScoping Brora 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2034
Scaw Law Wind Farm
Wind + storage · Perigus Energy UK Limited
60 MWScoping Scaw Law 132kV substation
SP Transmission (south Scotland)
Oct 2036
Touch Energy Park
Wind + storage · Naturalis Energy Developments Ltd
60 MWScoping Stirling 132/33kV
SP Transmission (south Scotland)
Jan 2029
Balnespick Wind Farm
Wind + storage · Fred Olsen Renewables Limited
58 MWScoping Balnespick Wind Farm 132kV/33kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Melvich Wind Energy Hub
Wind + storage · Melvich Wind Energy Hub Limited
58 MWAwaiting Consents Melvich Community Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Manquhill Wind Farm
Wind + storage · Energyfarm UK Manquhill Ltd
56 MWScoping Manquhill Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Oct 2036
Sclenteuch Energy Park
Wind + storage · Sclenteuch Energy Limited
54 MWScoping Sclenteuch Energy Park 132kV
SP Transmission (south Scotland)
Oct 2029
Ditcher Law
Wind + storage · E Power Limited
53 MWAwaiting Consents Dunlaw Extension 132/33kV
SP Transmission (south Scotland)
Oct 2031
Cloud Hill Windfarm
Wind + storage · Cloud Hill Windfarm Limited
50 MWAwaiting Consents Glenglass 132/33kV
SP Transmission (south Scotland)
May 2030
Greenburn Wind & BESS
Wind + storage · Hm Gb (Wind) Ltd
50 MWScoping Coupar Angus 2 GSP
SSEN Transmission (north Scotland)
Oct 2031
Daviot Windfarm BEGA
Wind + storage · Cubico UK Development Limited
45 MWScoping Inverness 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2030
Balgray Wind Farm
Wind + storage · Fred Olsen Renewables Limited
43 MWScoping Dumfries North 400/132kV substation
National Grid (England & Wales)
Oct 2037
Cairnborrow Wind Energy Hub
Wind + storage · Bpuwl 29 Limited
43 MWScoping Cairnford GSP
SSEN Transmission (north Scotland)
Oct 2031

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.