πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Wind + storage

WIND + STORAGE Β· SHET

Sleat Hybrid

Sleat Hybrid is a 100 MW wind + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Broadford GSP, with capacity due from October 2034. The connection agreement is held by Galileo 13 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004014
Customer
Galileo 13 Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
100 MW
Change in this agreement
+100 MW
Capacity effective from
31 October 2034
Connection site
Broadford GSP
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Broadford GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem