Grid infrastructure βΊ Connection queue βΊ Wind + storage
WIND + STORAGE Β· SHETTarvie Wind Farm
Tarvie Wind Farm is a 77 MW wind + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Beauly substation 275KV, with capacity due from October 2033. The connection agreement is held by Koehler Renewable Energy UK Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005149
- Customer
- Koehler Renewable Energy UK Limited
- Technology
- Energy Storage System, Wind Onshore
- Total capacity
- 77 MW
- Change in this agreement
- +77 MW
- Capacity effective from
- 30 October 2033
- Connection site
- Beauly substation 275KV
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem