Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Edgewood Solar Hybrid Solar + storage |
3,400 MW | Withdrawn / abandoned |
| Eternal Pumped Storage Other |
2,807 MW | Withdrawn / abandoned |
| Vinson Energy Wind + storage |
1,887 MW | Withdrawn / abandoned |
| Intrepid Energy Wind + storage |
1,887 MW | Withdrawn / abandoned |
| Lighthouse Wind Offshore wind |
1,456 MW | Withdrawn / abandoned |
| Western Coast Wind 1 Offshore wind |
1,021 MW | Withdrawn / abandoned |
| Leo Wolf Energy Center Solar + storage |
1,017 MW | Withdrawn / abandoned |
| Menard Energy Storage Battery storage |
950 MW | Withdrawn / abandoned |
| Longhorn 1 Solar + storage |
812 MW | Withdrawn / abandoned |
| Central Coast Wind 1 Onshore wind |
772 MW | Withdrawn / abandoned |
| Rock Dove 1 Energy Center Solar + storage |
701 MW | Withdrawn / abandoned |
| Rock Dove 2 Energy Center Solar + storage |
701 MW | Withdrawn / abandoned |
| Bluff Trail Storage Battery storage |
632 MW | Withdrawn / abandoned |
| Pecho Energy Storage Other |
628 MW | Withdrawn / abandoned |
| Ventoso Other |
623 MW | Withdrawn / abandoned |
| Astra Other |
620 MW | Withdrawn / abandoned |
| Fortuna Other |
620 MW | Withdrawn / abandoned |
| Valorem Other |
619 MW | Withdrawn / abandoned |
| Fortis Other |
616 MW | Withdrawn / abandoned |
| Porta Other |
615 MW | Withdrawn / abandoned |
| Venado Valley 1 Solar + storage |
610 MW | Withdrawn / abandoned |
| Meteorite Solar Solar + storage |
600 MW | Withdrawn / abandoned |
| Lycka Solar Solar + storage |
587 MW | Withdrawn / abandoned |
| Kairos Hybrid Solar + storage |
539 MW | Withdrawn / abandoned |
| Milky Way Hybrid Solar Solar + storage |
530 MW | Withdrawn / abandoned |
| Grisedale Storage 1 Battery storage |
510 MW | Withdrawn / abandoned |
| Mortimer Solar Hybrid Solar + storage |
500 MW | Withdrawn / abandoned |
| Greasewood Hybrid Solar + storage |
494 MW | Withdrawn / abandoned |
| Big Horn Energy Storage Battery storage |
425 MW | Withdrawn / abandoned |
| Boulder Oaks Hybrid 2 Wind + storage |
411 MW | Withdrawn / abandoned |
| Bulldog Energy Storage Battery storage |
408 MW | Withdrawn / abandoned |
| Seguro Storage Battery storage |
407 MW | Withdrawn / abandoned |
| Comal Flats 1 Solar + storage |
405 MW | Withdrawn / abandoned |
| Luzen Solar Energy Center Solar + storage |
313 MW | Withdrawn / abandoned |
| Crossroads Storage Battery storage |
313 MW | Withdrawn / abandoned |
| Anacapa Solar + storage |
309 MW | Withdrawn / abandoned |
| Robin 2 Solar + storage |
308 MW | Withdrawn / abandoned |
| Muir Storage Battery storage |
305 MW | Withdrawn / abandoned |
| Speedway ESS 2 Battery storage |
300 MW | Withdrawn / abandoned |
| Miranda ESS 2 Battery storage |
300 MW | Withdrawn / abandoned |
| Amethyst Solar Solar + storage |
300 MW | Withdrawn / abandoned |
| Swan ESS Battery storage |
300 MW | Withdrawn / abandoned |
| GYPSY ESS 2 Battery storage |
300 MW | Withdrawn / abandoned |
| Chia ESS Battery storage |
300 MW | Withdrawn / abandoned |
| Alta 20 Wind Onshore wind |
258 MW | Withdrawn / abandoned |
| Brisbane Energy Storage Battery storage |
254 MW | Withdrawn / abandoned |
| Solar + storage project 4, Sacramento County Solar + storage |
250 MW | Withdrawn / abandoned |
| Quicksilver Energy Storage Battery storage |
250 MW | Withdrawn / abandoned |
| Solar + storage project 5, Sacramento County Solar + storage |
250 MW | Withdrawn / abandoned |
| Verbena Solar + storage |
247 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)