United States โ€บ Grid โ€บ Interconnection queues โ€บ California

OCTARY USA ยท INTERCONNECTION QUEUES

Withdrawn queue requests in California (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown10439.8 GW
Active in queue14.6 GW40 requests
Agreement signed10.2 GW26 requests
Withdrawn10439.8 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

104 requests ยท page 1 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
Edgewood Solar Hybrid
Solar + storage
3,400 MWWithdrawn / abandoned Fresno, CACAISO Apr 2020target 2024
Eternal Pumped Storage
Other
2,807 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2026
Vinson Energy
Wind + storage
1,887 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2027
Intrepid Energy
Wind + storage
1,887 MWWithdrawn / abandoned Humboldt, CACAISO Apr 2020target 2027
Lighthouse Wind
Offshore wind
1,456 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2027
Western Coast Wind 1
Offshore wind
1,021 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2027
Leo Wolf Energy Center
Solar + storage
1,017 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2020target 2024
Menard Energy Storage
Battery storage
950 MWWithdrawn / abandoned Solano, CACAISO Apr 2020target 2023
Longhorn 1
Solar + storage
812 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Central Coast Wind 1
Onshore wind
772 MWWithdrawn / abandoned Santa Barbara, CACAISO Apr 2020target 2027
Rock Dove 1 Energy Center
Solar + storage
701 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Rock Dove 2 Energy Center
Solar + storage
701 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2025
Bluff Trail Storage
Battery storage
632 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2027
Pecho Energy Storage
Other
628 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2031
Ventoso
Other
623 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2020target 2027
Astra
Other
620 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2024
Fortuna
Other
620 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2024
Valorem
Other
619 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Fortis
Other
616 MWWithdrawn / abandoned Solano, CACAISO Apr 2020target 2028
Porta
Other
615 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2029
Venado Valley 1
Solar + storage
610 MWWithdrawn / abandoned Rosamond, CACAISO Apr 2020target 2024
Meteorite Solar
Solar + storage
600 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Lycka Solar
Solar + storage
587 MWWithdrawn / abandoned Tulare, CACAISO Apr 2020target 2024
Kairos Hybrid
Solar + storage
539 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2025
Milky Way Hybrid Solar
Solar + storage
530 MWWithdrawn / abandoned Kings, CACAISO Apr 2020target 2023
Grisedale Storage 1
Battery storage
510 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2022
Mortimer Solar Hybrid
Solar + storage
500 MWWithdrawn / abandoned Kings, CACAISO Apr 2020target 2024
Greasewood Hybrid
Solar + storage
494 MWWithdrawn / abandoned Colusa, CACAISO Apr 2020target 2023
Big Horn Energy Storage
Battery storage
425 MWWithdrawn / abandoned Imperial, CACAISO Apr 2020target 2024
Boulder Oaks Hybrid 2
Wind + storage
411 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2023
Bulldog Energy Storage
Battery storage
408 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2020target 2023
Seguro Storage
Battery storage
407 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2032
Comal Flats 1
Solar + storage
405 MWWithdrawn / abandoned Fresno, CACAISO Apr 2020target 2024
Luzen Solar Energy Center
Solar + storage
313 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2020target 2022
Crossroads Storage
Battery storage
313 MWWithdrawn / abandoned Shasta, CACAISO Apr 2020target 2027
Anacapa
Solar + storage
309 MWWithdrawn / abandoned Santa Barbara, CACAISO Apr 2020target 2023
Robin 2
Solar + storage
308 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2023
Muir Storage
Battery storage
305 MWWithdrawn / abandoned Marin, CACAISO Apr 2020target 2025
Speedway ESS 2
Battery storage
300 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2020target 2024
Miranda ESS 2
Battery storage
300 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2020target 2024
Amethyst Solar
Solar + storage
300 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2023
Swan ESS
Battery storage
300 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2020target 2025
GYPSY ESS 2
Battery storage
300 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2024
Chia ESS
Battery storage
300 MWWithdrawn / abandoned Alameda, CACAISO Apr 2020target 2025
Alta 20 Wind
Onshore wind
258 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2025
Brisbane Energy Storage
Battery storage
254 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2020target 2023
Solar + storage project 4, Sacramento County
Solar + storage
250 MWWithdrawn / abandoned Sacramento, CAWest Jun 2020target 2027
Quicksilver Energy Storage
Battery storage
250 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2020target 2024
Solar + storage project 5, Sacramento County
Solar + storage
250 MWWithdrawn / abandoned Sacramento, CAWest Nov 2020target 2029
Verbena
Solar + storage
247 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2023
Page 1 of 3

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)