BATTERY STORAGE · CAISO

Crossroads Storage

Crossroads Storage is a 313 MW battery storage request withdrawn in the CAISO interconnection queue, in Shasta County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedApr 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1688
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Round Mountain 230 kV
Location
Shasta County, California
Technology
Battery: 313 MW
Total requested
313 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
April 2027
Withdrawn
April 2024

Location

Marker shows the centre of Shasta County; the queue data does not give exact sites.