United States › Grid › Interconnection queues › California
SOLAR + STORAGE · WESTSolar + storage project 2024-G2, Shasta County
Solar + storage project 2024-G2, Shasta County is a 125 MW solar + storage request in interconnection study in the West interconnection queue, in Shasta County, California, connecting to WAPA Sierra Nevada.
- PlanningQueued Nov 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 2024-G2
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA Sierra Nevada
- Connection point (POI)
- Round Mtn-Cottonwood #1 230 kV Transmission Line
- Location
- Shasta County, California
- Technology
- Solar: 125 MW · Battery
- Total requested
- 125 MW
- Service type
- NRIS and ERIS
- Study phase
- Not Started
- Queue status
- Active
- Entered queue
- 1 November 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Shasta County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Shasta County
- Fountain WindOnshore wind · 206 MW · agreement signed
- Hatchet Ridge Wind Farm ProjectOnshore wind · 102 MW · built
- Hydro project 1055, Shasta CountyHydro · 4.2 MW · built
- Round Mountain Wind ProjectOnshore wind · 350 MW · withdrawn
- Crossroads StorageBattery storage · 313 MW · withdrawn
- Timber Hills Wind (Fka Hillcrest Wind Power 1)Onshore wind · 138 MW · withdrawn
- Meadow Ridge Solar And BatterySolar + storage · 114 MW · withdrawn
- Las Hermanas BESSBattery storage · 110 MW · withdrawn
- Paradise Peak Wind Power ProjectOnshore wind · 102 MW · withdrawn
- Origin Energy StorageBattery storage · 102 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem