🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Timber Hills Wind (Fka Hillcrest Wind Power 1)

Timber Hills Wind (Fka Hillcrest Wind Power 1) is a 138 MW onshore wind request withdrawn in the CAISO interconnection queue, in Shasta County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2010 (completed)
  2. Withdrawn / abandonedOct 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
554
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Pit River 1-Cottonwood 230kV
Location
Shasta County, California
Technology
Wind: 138 MW
Total requested
138 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 February 2010
Proposed online date
December 2013
Withdrawn
October 2011

Location

Marker shows the centre of Shasta County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Shasta County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem