United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Meadow Ridge Solar And Battery

Meadow Ridge Solar And Battery is a 114 MW solar + storage request withdrawn in the CAISO interconnection queue, in Shasta County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedMay 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1860
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Pit 1-Cottonwood 230 kV Line
Location
Shasta County, California
Technology
Solar: 93.5 MW · Battery: 20.0 MW
Total requested
114 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
February 2034
Withdrawn
May 2024

Location

Marker shows the centre of Shasta County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Shasta County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem