BATTERY STORAGE · CAISO

Las Hermanas BESS

Las Hermanas BESS is a 110 MW battery storage request withdrawn in the CAISO interconnection queue, in Shasta County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedJul 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1276
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Carberry Switching Station 230kV
Location
Shasta County, California
Technology
Battery: 110 MW
Total requested
110 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
May 2019
Withdrawn
July 2016

Location

Marker shows the centre of Shasta County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Shasta County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem