Paradise Peak Wind Power Project

Paradise Peak Wind Power Project is a 102 MW onshore wind request withdrawn in the CAISO interconnection queue, in Shasta County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2010 (completed)
  2. Withdrawn / abandonedSep 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
570
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Trinity-Cottonwood 115 kV Line
Location
Shasta County, California
Technology
Wind: 102 MW
Total requested
102 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 February 2010
Proposed online date
November 2012
Withdrawn
September 2010

Location

Marker shows the centre of Shasta County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Shasta County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem