🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Greasewood Hybrid

Greasewood Hybrid is a 494 MW solar + storage request withdrawn in the CAISO interconnection queue, in Colusa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1699
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Delevan-Vaca #3 230kV line
Location
Colusa County, California
Technology
Solar: 327 MW · Battery: 167 MW
Total requested
494 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
December 2023
Withdrawn
July 2020

Location

Marker shows the centre of Colusa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Colusa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem