SOLAR + STORAGE · CAISO

Beauchamp 2 Solar

Beauchamp 2 Solar is a 225 MW solar + storage request withdrawn in the CAISO interconnection queue, in Colusa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1543
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Cortina Substation 115kV
Location
Colusa County, California
Technology
Solar: 150 MW · Battery: 75.0 MW
Total requested
225 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
December 2023
Withdrawn
March 2020

Location

Marker shows the centre of Colusa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Colusa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem