United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISOSaloon Energy Storage
Saloon Energy Storage is a 150 MW battery storage request with a signed interconnection agreement in the CAISO interconnection queue, in Colusa County, California, connecting to PGAE.
Queue statusConsented
- PlanningQueued Apr 2018 (completed)
- ConsentedFeb 2024 (current stage)
- Construction (not yet reached)
- OperatingTarget Jul 2027 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 1444
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Cortina 115 kV
- Location
- Colusa County, California
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Active
- Entered queue
- 16 April 2018
- Agreement signed
- 27 February 2024
- Proposed online date
- July 2027
Location
Marker shows the centre of Colusa County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Colusa County
- Descendant Ranch 1Solar + storage · 1,024 MW · agreement signed
- JanusSolar + storage · 164 MW · agreement signed
- CowboySolar + storage · 312 MW · in study
- Off Stream Water StorageBattery storage · 68.9 MW · in study
- CPV ColusaGas · 715 MW · built
- Descendant Ranch 2Solar + storage · 1,024 MW · withdrawn
- Greasewood HybridSolar + storage · 494 MW · withdrawn
- Ranchero SolarSolar + storage · 450 MW · withdrawn
- Beauchamp 2 SolarSolar + storage · 225 MW · withdrawn
- Williams Energy CenterGas · 200 MW · withdrawn
- Cowboy HybridSolar + storage · 156 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem