United States βΊ Grid βΊ Interconnection queues βΊ California
GAS Β· CAISOWilliams Energy Center
Williams Energy Center is a 200 MW gas request withdrawn in the CAISO interconnection queue, in Colusa County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2008 (completed)
- Withdrawn / abandonedJul 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 360
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Cortina Substation 230kV Bus
- Location
- Colusa County, California
- Technology
- Gas: 200 MW
- Total requested
- 200 MW
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 1 May 2008
- Proposed online date
- June 2012
- Withdrawn
- July 2008
Location
Marker shows the centre of Colusa County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Colusa County
- Descendant Ranch 1Solar + storage Β· 1,024 MW Β· agreement signed
- JanusSolar + storage Β· 164 MW Β· agreement signed
- Saloon Energy StorageBattery storage Β· 150 MW Β· agreement signed
- CowboySolar + storage Β· 312 MW Β· in study
- Off Stream Water StorageBattery storage Β· 68.9 MW Β· in study
- CPV ColusaGas Β· 715 MW Β· built
- Descendant Ranch 2Solar + storage Β· 1,024 MW Β· withdrawn
- Greasewood HybridSolar + storage Β· 494 MW Β· withdrawn
- Ranchero SolarSolar + storage Β· 450 MW Β· withdrawn
- Beauchamp 2 SolarSolar + storage Β· 225 MW Β· withdrawn
- Cowboy HybridSolar + storage Β· 156 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem