United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Descendant Ranch 2

Descendant Ranch 2 is a 1,024 MW solar + storage request withdrawn in the CAISO interconnection queue, in Colusa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1448
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Logan Creek - Delevan Line Tap 230kV
Location
Colusa County, California
Technology
Solar: 514 MW · Battery: 510 MW
Total requested
1,024 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
December 2023
Withdrawn
March 2019

Location

Marker shows the centre of Colusa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Colusa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem