SOLAR + STORAGE Β· CAISOCowboy Hybrid
Cowboy Hybrid is a 156 MW solar + storage request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54593
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- DELEVAN 230 kV
- Location
- California
- Technology
- Solar: 155 MW Β· Battery: 1.0 MW
- Total requested
- 156 MW
- Service type
- Energy only (ERIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- April 2028
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Descendant Ranch 1Solar + storage Β· 1,024 MW Β· agreement signed
- JanusSolar + storage Β· 164 MW Β· agreement signed
- Saloon Energy StorageBattery storage Β· 150 MW Β· agreement signed
- CowboySolar + storage Β· 312 MW Β· in study
- Off Stream Water StorageBattery storage Β· 68.9 MW Β· in study
- CPV ColusaGas Β· 715 MW Β· built
- Descendant Ranch 2Solar + storage Β· 1,024 MW Β· withdrawn
- Greasewood HybridSolar + storage Β· 494 MW Β· withdrawn
- Ranchero SolarSolar + storage Β· 450 MW Β· withdrawn
- Beauchamp 2 SolarSolar + storage Β· 225 MW Β· withdrawn
- Williams Energy CenterGas Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem