United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Mortimer Solar Hybrid

Mortimer Solar Hybrid is a 500 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kings County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1722
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Mustang Switching Station 230kV
Location
Kings County, California
Technology
Solar: 250 MW · Battery: 250 MW
Total requested
500 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
April 2024
Withdrawn
April 2021

Location

Marker shows the centre of Kings County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kings County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem