United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Leo Wolf Energy Center

Leo Wolf Energy Center is a 1,017 MW solar + storage request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1771
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Kramer Junction Substation 230kV
Location
San Bernardino County, California
Technology
Solar: 509 MW · Battery: 509 MW
Total requested
1,017 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
November 2024
Withdrawn
September 2020

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem