BATTERY STORAGE · CAISO

Bulldog Energy Storage

Bulldog Energy Storage is a 408 MW battery storage request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1765
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Rio Hondo Substation 220kV
Location
Los Angeles County, California
Technology
Battery: 408 MW
Total requested
408 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
June 2023
Withdrawn
March 2021

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.