United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR + STORAGE Β· WEST

Solar + storage project 5, Sacramento County

Solar + storage project 5, Sacramento County is a 250 MW solar + storage request withdrawn in the West interconnection queue, in Sacramento County, California, connecting to Sacramento Municipal Utility District.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
5
Grid region
West (non-ISO utilities)
Utility / transmission owner
Sacramento Municipal Utility District
Connection point (POI)
New substation near Elverta 230kV Substation
Location
Sacramento County, California
Technology
Solar: 250 MW Β· Battery
Total requested
250 MW
Study phase
Facility Study
Queue status
Withdrawn
Entered queue
3 November 2020
Proposed online date
January 2029

Location

Marker shows the centre of Sacramento County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Sacramento County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem