United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Milky Way Hybrid Solar

Milky Way Hybrid Solar is a 530 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kings County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1721
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Gates- Templeton 230kV line
Location
Kings County, California
Technology
Solar: 355 MW · Battery: 175 MW
Total requested
530 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
November 2023
Withdrawn
April 2021

Location

Marker shows the centre of Kings County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kings County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem