SOLAR + STORAGE Β· CAISO

Kairos Hybrid

Kairos Hybrid is a 539 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedMay 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1737
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Midway Substation 230kV
Location
Kern County, California
Technology
Solar: 359 MW Β· Battery: 179 MW
Total requested
539 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
October 2025
Withdrawn
May 2021

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.