United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Brisbane Energy Storage

Brisbane Energy Storage is a 254 MW battery storage request withdrawn in the CAISO interconnection queue, in San Mateo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1682
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Martin
Location
San Mateo County, California
Technology
Battery: 254 MW
Total requested
254 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
October 2023
Withdrawn
April 2021

Location

Marker shows the centre of San Mateo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Mateo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem