United States βΊ Grid βΊ Interconnection queues βΊ California
BATTERY STORAGE Β· CAISOLuna Mar
Luna Mar is a 23.0 MW battery storage request withdrawn in the CAISO interconnection queue, in San Mateo County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandonedApr 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1359
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Half Moon Bay Substation 60kV
- Location
- San Mateo County, California
- Technology
- Battery: 23.0 MW
- Total requested
- 23.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 1 May 2017
- Proposed online date
- December 2021
- Withdrawn
- April 2018
Location
Marker shows the centre of San Mateo County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in San Mateo County
- Baylands BatteryBattery storage Β· 250 MW Β· agreement signed
- Sunbeam StorageBattery storage Β· 101 MW Β· agreement signed
- Ox Mountain Landfill Gas GenerationGas Β· 12.6 MW Β· built
- Brisbane EsBattery storage Β· 412 MW Β· withdrawn
- Brisbane Energy StorageBattery storage Β· 254 MW Β· withdrawn
- Adrian StorageBattery storage Β· 55.5 MW Β· withdrawn
- SGS Livermore (Fka SGS South San Francisco)Battery storage Β· 50.0 MW Β· withdrawn
- Starburst StorageBattery storage Β· 40.4 MW Β· withdrawn
- Holocrystalline Energy CenterBattery storage Β· 40.0 MW Β· withdrawn
- Cooley Landing BESSBattery storage Β· 20.0 MW Β· withdrawn
- Round House Energy StorageBattery storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem