United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

SGS Livermore (Fka SGS South San Francisco)

SGS Livermore (Fka SGS South San Francisco) is a 50.0 MW battery storage request withdrawn in the CAISO interconnection queue, in San Mateo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2014 (completed)
  2. Withdrawn / abandonedMay 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1018
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Las Positas 60 kV
Location
San Mateo County, California
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2014
Proposed online date
January 2019
Withdrawn
May 2015

Location

Marker shows the centre of San Mateo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Mateo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem