United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Big Horn Energy Storage

Big Horn Energy Storage is a 425 MW battery storage request withdrawn in the CAISO interconnection queue, in Imperial County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedFeb 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1827
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Imperial Valley Substation 230kV
Location
Imperial County, California
Technology
Battery: 425 MW
Total requested
425 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
July 2024
Withdrawn
February 2024

Location

Marker shows the centre of Imperial County; the queue data does not give exact sites.