GYPSY ESS 2

GYPSY ESS 2 is a 300 MW battery storage request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1813
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Bay Boulevard 230kV
Location
San Diego County, California
Technology
Battery: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
December 2024
Withdrawn
July 2020

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.