United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Rock Dove 1 Energy Center

Rock Dove 1 Energy Center is a 701 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedMay 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1724
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Arco - Midway 230kV line
Location
Kern County, California
Technology
Solar: 313 MW · Battery: 388 MW
Total requested
701 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
November 2024
Withdrawn
May 2021

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem