United States βΊ Grid βΊ Interconnection queues βΊ California
OTHER Β· CAISOVentoso
Ventoso is a 623 MW other request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- ConsentedDec 2023 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1776
- Grid region
- CAISO (California)
- Utility / transmission owner
- SCE
- Connection point (POI)
- COOLWATER SUBSTATION 115kV
- Location
- San Bernardino County, California
- Technology
- Solar: 207 MW Β· Wind: 212 MW Β· Battery: 204 MW
- Total requested
- 623 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Withdrawn
- Entered queue
- 15 April 2020
- Agreement signed
- 8 December 2023
- Proposed online date
- October 2027
- Withdrawn
- November 2025
Location
Marker shows the centre of San Bernardino County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in San Bernardino County
- Cady SolarSolar + storage Β· 626 MW Β· agreement signed
- Daggett Solar 3Solar + storage Β· 522 MW Β· agreement signed
- Conduit Energy StorageBattery storage Β· 513 MW Β· agreement signed
- Dos PalmasBattery storage Β· 411 MW Β· agreement signed
- Hidalgo Energy StorageBattery storage Β· 408 MW Β· agreement signed
- TrolleyBattery storage Β· 406 MW Β· agreement signed
- Aratina Solar Center 1Solar + storage Β· 400 MW Β· agreement signed
- Sienna Solar FarmSolar + storage Β· 400 MW Β· agreement signed
- Roadhouse StorageBattery storage Β· 313 MW Β· agreement signed
- Overnight SolarSolar + storage Β· 300 MW Β· agreement signed
- Solar project Q06, San Bernardino CountySolar Β· 300 MW Β· agreement signed
- Baldy MesaSolar + storage Β· 225 MW Β· agreement signed
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem