🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Venado Valley 1

Venado Valley 1 is a 610 MW solar + storage request withdrawn in the CAISO interconnection queue, in Rosamond County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1794
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
WhirlWind Substation 230kV
Location
Rosamond County, California
Technology
Solar: 305 MW · Battery: 305 MW
Total requested
610 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
September 2024
Withdrawn
March 2021

Location

Marker shows the centre of Rosamond County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Rosamond County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem