BATTERY STORAGE · CAISO

Bluff Trail Storage

Bluff Trail Storage is a 632 MW battery storage request withdrawn in the CAISO interconnection queue, in San Luis Obispo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1733
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Mesa Substation 230kV
Location
San Luis Obispo County, California
Technology
Battery: 632 MW
Total requested
632 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
August 2027
Withdrawn
November 2023

Location

Marker shows the centre of San Luis Obispo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Luis Obispo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem