Withdrawn queue requests in CAISO (California) (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown10746.6 GW
Active in queue16.3 GW41 requests
Agreement signed12.6 GW32 requests
Withdrawn10746.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

107 requests Β· page 1 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
Arizona A1
Solar + storage
3,645 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2020target 2025
Edgewood Solar Hybrid
Solar + storage
3,400 MWWithdrawn / abandoned Fresno, CACAISO Apr 2020target 2024
Eternal Pumped Storage
Other
2,807 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2026
Vinson Energy
Wind + storage
1,887 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2027
Intrepid Energy
Wind + storage
1,887 MWWithdrawn / abandoned Humboldt, CACAISO Apr 2020target 2027
Lighthouse Wind
Offshore wind
1,456 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2027
Western Coast Wind 1
Offshore wind
1,021 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2027
Leo Wolf Energy Center
Solar + storage
1,017 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2020target 2024
Menard Energy Storage
Battery storage
950 MWWithdrawn / abandoned Solano, CACAISO Apr 2020target 2023
Sun Streams 5
Solar + storage
948 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2020target 2025
La Paz
Solar + storage
943 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2020target 2024
Longhorn 1
Solar + storage
812 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Central Coast Wind 1
Onshore wind
772 MWWithdrawn / abandoned Santa Barbara, CACAISO Apr 2020target 2027
Rock Dove 1 Energy Center
Solar + storage
701 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Rock Dove 2 Energy Center
Solar + storage
701 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2025
Bluff Trail Storage
Battery storage
632 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2027
Pecho Energy Storage
Other
628 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2031
Ventoso
Other
623 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2020target 2027
Astra
Other
620 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2024
Fortuna
Other
620 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2024
Valorem
Other
619 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Fortis
Other
616 MWWithdrawn / abandoned Solano, CACAISO Apr 2020target 2028
Porta
Other
615 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2029
Papago
Solar + storage
613 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2020target 2023
Venado Valley 1
Solar + storage
610 MWWithdrawn / abandoned Rosamond, CACAISO Apr 2020target 2024
Meteorite Solar
Solar + storage
600 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Lycka Solar
Solar + storage
587 MWWithdrawn / abandoned Tulare, CACAISO Apr 2020target 2024
Kairos Hybrid
Solar + storage
539 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2025
Milky Way Hybrid Solar
Solar + storage
530 MWWithdrawn / abandoned Kings, CACAISO Apr 2020target 2023
Grisedale Storage 1
Battery storage
510 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2022
Vulcan 2
Solar + storage
505 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2020target 2024
Mortimer Solar Hybrid
Solar + storage
500 MWWithdrawn / abandoned Kings, CACAISO Apr 2020target 2024
Greasewood Hybrid
Solar + storage
494 MWWithdrawn / abandoned Colusa, CACAISO Apr 2020target 2023
Sun Streams 4
Solar + storage
450 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2020target 2024
Bonanza Solar 2
Solar + storage
450 MWWithdrawn / abandoned Clark, NVCAISO Apr 2020target 2024
Big Horn Energy Storage
Battery storage
425 MWWithdrawn / abandoned Imperial, CACAISO Apr 2020target 2024
Boulder Oaks Hybrid 2
Wind + storage
411 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2023
Bulldog Energy Storage
Battery storage
408 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2020target 2023
Seguro Storage
Battery storage
407 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2032
Comal Flats 1
Solar + storage
405 MWWithdrawn / abandoned Fresno, CACAISO Apr 2020target 2024
Luzen Solar Energy Center
Solar + storage
313 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2020target 2022
Crossroads Storage
Battery storage
313 MWWithdrawn / abandoned Shasta, CACAISO Apr 2020target 2027
Anacapa
Solar + storage
309 MWWithdrawn / abandoned Santa Barbara, CACAISO Apr 2020target 2023
Robin 2
Solar + storage
308 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2023
Muir Storage
Battery storage
305 MWWithdrawn / abandoned Marin, CACAISO Apr 2020target 2025
Speedway ESS 2
Battery storage
300 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2020target 2024
Miranda ESS 2
Battery storage
300 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2020target 2024
Amethyst Solar
Solar + storage
300 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2023
Swan ESS
Battery storage
300 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2020target 2025
GYPSY ESS 2
Battery storage
300 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2024
Page 1 of 3

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)