United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

SOLAR + STORAGE Β· CAISO

Bonanza Solar 2

Bonanza Solar 2 is a 450 MW solar + storage request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to GLW.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1797
Grid region
CAISO (California)
Utility / transmission owner
GLW
Connection point (POI)
Innovation Substation 230kV
Location
Clark County, Nevada
Technology
Solar: 300 MW Β· Battery: 150 MW
Total requested
450 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
December 2024
Withdrawn
April 2021

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem