United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in ERCOT (Texas) — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| East Blackland Solar Solar + storage · East Blackland Holdings LLC |
144 MW | |
| Tavener Solar Solar · Fort Bend Solar LLC |
144 MW | |
| Sheep Creek Storage Other · Longhorn Storage LLC |
142 MW | |
| Pioneer DJ Wind Onshore wind · Pioneer Hutt Wind Energy LLC |
140 MW | |
| Louis (Buffalo Gap 3) Onshore wind · AES Seawest |
138 MW | |
| Nebula Solar Solar · Rayos Del Sol Solar Project, LLC |
138 MW | |
| Strategic Solar 1 Solar · Elm Branch Solar 1, LLC |
137 MW | |
| Sweetwater Wind 3 Onshore wind · Sweetwater Wind 3 LLC |
136 MW | |
| Blue Summit I Repower Wind + storage |
135 MW | |
| Blue Summit Windfarm Onshore wind · NextEra Energy |
135 MW | |
| Elara Solar Solar · Elara Energy Project, LLC |
132 MW | |
| Giga Texas Energy Storage Other · Giga Texas Energy, LLC. |
131 MW | |
| Orange Grove Solar Solar + storage · Enbridge Solar (Orange Grove), LLC |
131 MW | |
| Lamar Power Upgrade Gas · Nextera |
130 MW | |
| Scurry County Wind Farm Onshore wind · Wind Tex Energy |
130 MW | |
| Vision Solar 1 Solar · Briar Creek Solar 1, LLC |
129 MW | |
| Fegc Gas · Friendswood Energy Genco |
129 MW | |
| Anchor Wind II Onshore wind |
129 MW | |
| Roadrunner Crossing Wind SLF Wind + storage · Roadrunner Crossing Wind Farm, LLC |
128 MW | |
| Roadrunner Crossing Wind II SLF Onshore wind · Roadrunner Crossing Wind Farm, LLC |
127 MW | |
| Airtricity Champion Wind Farm Onshore wind · Airtricity, INC |
126 MW | |
| Coniglio Solar Solar · BT Coniglio Solar, LLC |
126 MW | |
| Tyler Bluff Wind Onshore wind · Southern Power Company |
126 MW | |
| Connolly Storage Other · BT Connolly Storage, LLC |
125 MW | |
| Wigeon Whistle BESS Other · Wigeon Whistle BESS |
123 MW | |
| Vortex BESS Other · AZURE SKY WIND STORAGE LLC |
122 MW | |
| Black Springs BESS Battery storage · Black Springs BESS LLC |
121 MW | |
| East Pecos Solar Solar · First Solar |
120 MW | |
| Stanton Wind Energy Onshore wind · Wind Tex Energy LLC |
120 MW | |
| Barton Chapel Wind Farm Onshore wind · Gamesa Energia Southwest |
120 MW | |
| Wagyu Solar Solar · Cypress Creek Renewables |
120 MW | |
| Camp Springs Wind Farm II Onshore wind · Invenergy LLC |
120 MW | |
| Gunsight Mt W Onshore wind · Invenergy |
120 MW | |
| Buffalo Gap1 Onshore wind · SeaWest WindPower |
120 MW | |
| Maverick Creek II Wind Onshore wind · Maverick Creek Wind, LLC |
119 MW | |
| Elbow Creek Wind Project Onshore wind · Elbow Creek Wind Project LLC |
117 MW | |
| BlueBell Solar II Solar · Bluebell Solar |
115 MW | |
| Airtricity Panther Creek 2 Onshore wind · Airtricity, Inc. |
115 MW | |
| Galloway 2 Solar Solar · 224WB 8me LLC |
114 MW | |
| Wolf Ridge Windfarm Onshore wind · FPL Energy, LLC |
113 MW | |
| Limestone Electric Gen Station upgrade Coal · Texas Genco |
110 MW | |
| Los Vientos V Onshore wind · Duke Energy |
110 MW | |
| West Texas Solar Solar · OCI Solar |
110 MW | |
| Emerald Grove Solar Solar · Emerald Grove Solar, LLC |
108 MW | |
| Solara Solar Solar · ConEd Development |
106 MW | |
| Capricorn Ridge IV Onshore wind · FPL Energy Capricorn Ridge Wind, LLC |
105 MW | |
| Limousin Oak Storage Other · KCE TX 15, LLC |
105 MW | |
| Silicon Hill Storage Other · KCE TX 12, LLC |
105 MW | |
| Hummingbird Storage Other · KCE TX 10, LLC |
104 MW | |
| Bright Arrow Storage Other · RWE Solar Development, LLC |
104 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- Southeast (non-ISO utilities)529 · 112.4 GW
- PJM (Mid-Atlantic, Midwest)1,192 · 97.6 GW
- ERCOT (Texas)613 · 95.3 GW
- MISO (Midcontinent)514 · 69.7 GW
- West (non-ISO utilities)963 · 64.7 GW
- SPP (Southwest Power Pool)299 · 45.1 GW
- CAISO (California)234 · 37.6 GW
- NYISO (New York)215 · 24.8 GW
- ISO-NE (New England)228 · 16.5 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)