SOLAR Β· ERCOTEast Pecos Solar
East Pecos Solar is a 120 MW solar request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 16INR0073
- Grid region
- ERCOT (Texas)
- Developer
- First Solar
- Connection point (POI)
- 132731 Bootleg 34.5kV
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 11 November 2014
- Agreement signed
- 6 March 2015
- Proposed online date
- March 2017
- Came online
- April 2017