ONSHORE WIND Β· ERCOT

Sweetwater Wind 3

Sweetwater Wind 3 is a 136 MW onshore wind request built and operating in the ERCOT interconnection queue.

Queue statusOperating
  1. PlanningQueued Sep 2005 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingTarget Dec 2005 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
01INR0036
Grid region
ERCOT (Texas)
Developer
Sweetwater Wind 3 LLC
Connection point (POI)
SWEETWN_WND334.500
Technology
Wind: 136 MW
Total requested
136 MW
Study phase
IA
Queue status
Operational
Entered queue
7 September 2005
Proposed online date
December 2005

Location

No county location in the queue data.