United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· ERCOTBarton Chapel Wind Farm
Barton Chapel Wind Farm is a 120 MW onshore wind request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 06INR0021
- Grid region
- ERCOT (Texas)
- Developer
- Gamesa Energia Southwest
- Connection point (POI)
- BRTSW_BCW1 34.500
- Technology
- Wind: 120 MW
- Total requested
- 120 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 13 December 2004
- Agreement signed
- 5 May 2006
- Proposed online date
- December 2007
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem