United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTBlack Springs BESS
Black Springs BESS is a 121 MW battery storage request built and operating in the ERCOT interconnection queue, in Palo Pinto County, Texas.
Request details
- Queue ID
- 24INR0315
- Grid region
- ERCOT (Texas)
- Developer
- Black Springs BESS LLC
- Connection point (POI)
- 1571 ORAN 138KV
- Location
- Palo Pinto County, Texas
- Technology
- Battery: 121 MW
- Total requested
- 121 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 17 April 2022
- Agreement signed
- 18 October 2023
- Proposed online date
- November 2025
- Came online
- December 2025
Location
Marker shows the centre of Palo Pinto County; the queue data does not give exact sites.
Other requests in Palo Pinto County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem