United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· ERCOTGunsight Mt W
Gunsight Mt W is a 120 MW onshore wind request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 08INR0018
- Grid region
- ERCOT (Texas)
- Developer
- Invenergy
- Connection point (POI)
- 138kV bus 1360
- Technology
- Wind: 120 MW
- Total requested
- 120 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 17 July 2006
- Agreement signed
- 12 November 2007
- Proposed online date
- September 2016
- Came online
- September 2016
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem