United States › Grid › Interconnection queues › Maine
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Maine — page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar |
10.0 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
10.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
10.0 MW | Withdrawn / abandoned |
| Raymond 115 kV SS - Raymond Area DG Study Solar |
9.9 MW | Withdrawn / abandoned |
| Wind Onshore wind |
9.6 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
9.4 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
9.1 MW | Withdrawn / abandoned |
| Solar Solar |
9.0 MW | Withdrawn / abandoned |
| Kimball DG Area Study Solar + storage |
7.9 MW | Withdrawn / abandoned |
| CMP County Road 115 kV SS - Winslow-Lakewood Areas Study Solar + storage |
7.8 MW | Withdrawn / abandoned |
| Biomass Other |
7.6 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
7.5 MW | Withdrawn / abandoned |
| Bowman Street 115 kV SS - Augusta Area Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Leeds 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study Solar |
5.0 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| CMP Spring St 115 kV SS - Greater Portland Area DG Study Solar |
5.0 MW | Withdrawn / abandoned |
| Solar Increase Solar |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| Sturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study Solar |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| CMP Elm St 115 kV SS - Greater Portland Area DG Study Solar |
5.0 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| CMP Biddeford IP 115 kV SS - Louden-Biddeford Area DG Study Solar |
4.9 MW | Withdrawn / abandoned |
| Puddledock Road 115 kV SS - Augusta Area Study Solar |
4.9 MW | Withdrawn / abandoned |
| Biomass Other |
4.9 MW | Withdrawn / abandoned |
| Puddledock Road 115 kV SS - Augusta Area Study Solar |
4.9 MW | Withdrawn / abandoned |
| Lincolnville 115 kV SS - Midcoast Area DG Study Solar |
4.9 MW | Withdrawn / abandoned |
| CMP West Buxton 115 kV SS - Louden-Biddeford Area DG Study Solar |
4.5 MW | Withdrawn / abandoned |
| CMP Moshers/Prides Corner 115 kV SS - Greater Portland Area DG Study Other |
4.0 MW | Withdrawn / abandoned |
| Solar Solar |
4.0 MW | Withdrawn / abandoned |
| Hydro Hydro |
3.9 MW | Withdrawn / abandoned |
| Mason 115 kV SS - Midcoast Area DG Study Solar |
3.9 MW | Withdrawn / abandoned |
| Bath 115 kV SS - Midcoast Area DG Study Solar |
3.4 MW | Withdrawn / abandoned |
| Coopers Mills 115 kV SS - Midcoast Area DG Study Solar |
2.9 MW | Withdrawn / abandoned |
| Wind uprate Onshore wind |
2.9 MW | Withdrawn / abandoned |
| Puddledock Road 115 kV SS - Augusta Area Study Solar |
2.5 MW | Withdrawn / abandoned |
| CMP Vallee Lane 115 kV SS - Louden-Biddeford Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Athens 115 kV SS - CMP Wyman Area Study Solar |
2.0 MW | Withdrawn / abandoned |
| Ludden Lane 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Topsham 115 kV SS - Midcoast Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Augusta E. Side 115 kV SS - Augusta Area Study Solar |
2.0 MW | Withdrawn / abandoned |
| Highland/Park St 115 kV SS - Midcoast Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Bowman Street 115 kV SS - Augusta Area Study Solar |
1.8 MW | Withdrawn / abandoned |
| Bowman Street 115 kV SS - Augusta Area Study Solar |
1.7 MW | Withdrawn / abandoned |
| Woodstock 115 kV SS - Roxbury-Rumford-Woodstock Area DG Study Solar |
1.6 MW | Withdrawn / abandoned |
| Wind Uprate (see QP290) Onshore wind |
1.5 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)