United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

OTHER Β· ISO-NE

Biomass

Biomass is a 4.9 MW other request withdrawn in the ISO-NE interconnection queue, in Cumberland County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2009 (completed)
  2. Withdrawn / abandonedSep 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
304
Grid region
ISO-NE (New England)
Connection point (POI)
CMP Moshers 34.5 kV
Location
Cumberland County, Maine
Technology
Other: 4.9 MW
Total requested
4.9 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
6 July 2009
Proposed online date
April 2012
Withdrawn
September 2009

Location

Marker shows the centre of Cumberland County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Cumberland County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem