United States βΊ Grid βΊ Interconnection queues βΊ Maine
OTHER Β· ISO-NEBiomass
Biomass is a 7.6 MW other request withdrawn in the ISO-NE interconnection queue, in Cumberland County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2009 (completed)
- Withdrawn / abandonedAug 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 303
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Rigby/Pleasant Hill 34.5 kV Line
- Location
- Cumberland County, Maine
- Technology
- Other: 7.6 MW
- Total requested
- 7.6 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 23 June 2009
- Proposed online date
- March 2010
- Withdrawn
- August 2009
Location
Marker shows the centre of Cumberland County; the queue data does not give exact sites.
Other requests in Cumberland County
- West Baldwin SolarSolar Β· 17.1 MW Β· agreement signed
- Cross Town Battery StorageBattery storage Β· 175 MW Β· built
- Casco Bay Energy StorageBattery storage Β· 16.2 MW Β· built
- Newcastle 115 kV SS - Midcoast Area DG StudySolar Β· 11.6 MW Β· withdrawn
- Battery StorageBattery storage Β· 10.0 MW Β· withdrawn
- Raymond 115 kV SS - Raymond Area DG StudySolar Β· 9.9 MW Β· withdrawn
- Solar and BatterySolar + storage Β· 5.0 MW Β· withdrawn
- CMP Spring St 115 kV SS - Greater Portland Area DG StudySolar Β· 5.0 MW Β· withdrawn
- CMP Elm St 115 kV SS - Greater Portland Area DG StudySolar Β· 5.0 MW Β· withdrawn
- BiomassOther Β· 4.9 MW Β· withdrawn
- CMP Moshers/Prides Corner 115 kV SS - Greater Portland Area DG StudyOther Β· 4.0 MW Β· withdrawn
- CMP Vallee Lane 115 kV SS - Louden-Biddeford Area DG StudySolar Β· 2.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem