Biomass

Biomass is a 7.6 MW other request withdrawn in the ISO-NE interconnection queue, in Cumberland County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2009 (completed)
  2. Withdrawn / abandonedAug 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
303
Grid region
ISO-NE (New England)
Connection point (POI)
Rigby/Pleasant Hill 34.5 kV Line
Location
Cumberland County, Maine
Technology
Other: 7.6 MW
Total requested
7.6 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
23 June 2009
Proposed online date
March 2010
Withdrawn
August 2009

Location

Marker shows the centre of Cumberland County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Cumberland County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem