United States βΊ Grid βΊ Interconnection queues βΊ Maine
SOLAR + STORAGE Β· ISO-NESolar and Battery
Solar and Battery is a 5.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2019 (completed)
- Withdrawn / abandonedOct 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 918
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CMP Trap Corner substation, Circuit 453D1
- Location
- Maine
- Technology
- Solar: 5.0 MW Β· Battery
- Total requested
- 5.0 MW
- Queue status
- Withdrawn
- Entered queue
- 29 August 2019
- Proposed online date
- December 2020
- Withdrawn
- October 2019
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem