SOLAR + STORAGE Β· ISO-NE

Solar and Battery

Solar and Battery is a 5.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2019 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
918
Grid region
ISO-NE (New England)
Connection point (POI)
CMP Trap Corner substation, Circuit 453D1
Location
Maine
Technology
Solar: 5.0 MW Β· Battery
Total requested
5.0 MW
Queue status
Withdrawn
Entered queue
29 August 2019
Proposed online date
December 2020
Withdrawn
October 2019

Location

No county location in the queue data.

Power plants in Maine Β· Transmission lines in Maine

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem