United States › Grid › Interconnection queues › Maine
SOLAR · ISO-NECoopers Mills 115 kV SS - Midcoast Area DG Study
Coopers Mills 115 kV SS - Midcoast Area DG Study is a 2.9 MW solar request withdrawn in the ISO-NE interconnection queue, in Lincoln County, Maine, connecting to CMP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1453
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- CMP
- Connection point (POI)
- CMP Coopers Mills 115 kV Substation
- Location
- Lincoln County, Maine
- Technology
- Solar: 2.9 MW
- Total requested
- 2.9 MW
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2024
- Withdrawn
- January 2025
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.
Other requests in Lincoln County
- Pumped Storage ProjectBattery storage · 1,000 MW · withdrawn
- Offshore WindOffshore wind · 12.0 MW · withdrawn
- WindOnshore wind · 11.9 MW · withdrawn
- Offshore WindOffshore wind · 10.0 MW · withdrawn
- Lincolnville 115 kV SS - Midcoast Area DG StudySolar · 4.9 MW · withdrawn
- Mason 115 kV SS - Midcoast Area DG StudySolar · 3.9 MW · withdrawn
- Bath 115 kV SS - Midcoast Area DG StudySolar · 3.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem