BATTERY STORAGE · ISO-NEPumped Storage Project
Pumped Storage Project is a 1,000 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Lincoln County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2008 (completed)
- Withdrawn / abandonedMar 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 270
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Maine Yankee 345 kV substation
- Location
- Lincoln County, Maine
- Technology
- Other Storage: 1,000 MW
- Total requested
- 1,000 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 17 July 2008
- Proposed online date
- June 2014
- Withdrawn
- March 2011
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.
Other requests in Lincoln County
- Offshore WindOffshore wind · 12.0 MW · withdrawn
- WindOnshore wind · 11.9 MW · withdrawn
- Offshore WindOffshore wind · 10.0 MW · withdrawn
- Lincolnville 115 kV SS - Midcoast Area DG StudySolar · 4.9 MW · withdrawn
- Mason 115 kV SS - Midcoast Area DG StudySolar · 3.9 MW · withdrawn
- Bath 115 kV SS - Midcoast Area DG StudySolar · 3.4 MW · withdrawn
- Coopers Mills 115 kV SS - Midcoast Area DG StudySolar · 2.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem