United States › Grid › Interconnection queues › Maine
SOLAR · ISO-NESturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study
Sturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study is a 5.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine, connecting to CMP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2023 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1449
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- CMP
- Connection point (POI)
- CMP Sturtevant 115 kV Substation
- Location
- Franklin County, Maine
- Technology
- Solar: 5.0 MW
- Total requested
- 5.0 MW
- Queue status
- Withdrawn
- Entered queue
- 29 September 2023
- Proposed online date
- December 2024
- Withdrawn
- June 2025
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Farminton SolarSolar · 78.4 MW · built
- Kibby Wind ProjectOnshore wind · 65.0 MW · built
- Saddleback Ridge Wind ProjectOnshore wind · 33.0 MW · built
- Verso Androscoggin Energy Cogen 1, 2, & 3 IncreaseGas · 26.0 MW · built
- Battery storage addition (see Q663)Wind + storage · 266 MW · withdrawn
- WindOnshore wind · 246 MW · withdrawn
- WindOnshore wind · 245 MW · withdrawn
- WindOnshore wind · 241 MW · withdrawn
- WindOnshore wind · 241 MW · withdrawn
- battery storage additional (see Q664)Wind + storage · 239 MW · withdrawn
- WindOnshore wind · 216 MW · withdrawn
- WindOnshore wind · 216 MW · withdrawn