United States › Grid › Interconnection queues › Maine
SOLAR + STORAGE · ISO-NEKimball DG Area Study
Kimball DG Area Study is a 7.9 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in York County, Maine, connecting to CMP.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2022 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1254
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- CMP
- Connection point (POI)
- CMP Kimball Road/Lovell 115 kV Substation
- Location
- York County, Maine
- Technology
- Solar: 7.9 MW · Battery
- Total requested
- 7.9 MW
- Queue status
- Withdrawn
- Entered queue
- 2 May 2022
- Proposed online date
- June 2028
- Withdrawn
- June 2025
Location
Marker shows the centre of York County; the queue data does not give exact sites.
Other requests in York County
- GDC Saco SolarSolar · 20.0 MW · agreement signed
- Emery Meadow SolarSolar · 16.4 MW · agreement signed
- SolarSolar · 180 MW · in study
- Sanford Airport SolarSolar · 50.0 MW · built
- Mousam River SolarSolar · 20.0 MW · built
- Westbrook Energy Center ExpansionGas · 9.5 MW · built
- Bonny Eagle Energy Storage - UprateOther · 8.0 MW · built
- SolarSolar · 4.8 MW · built
- Skelton Station Modernization Phase 1Hydro · 1.1 MW · built
- SolarSolar · 150 MW · withdrawn
- Battery StorageBattery storage · 50.7 MW · withdrawn
- SolarSolar · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem