United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

HYDRO Β· ISO-NE

Hydro

Hydro is a 3.9 MW hydro request withdrawn in the ISO-NE interconnection queue, in Penobscot County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedApr 2011 (project stopped here)
  3. ConsentedApr 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
358
Grid region
ISO-NE (New England)
Connection point (POI)
BHE Orono 12.5 kV substation
Location
Penobscot County, Maine
Technology
Hydro: 3.9 MW
Total requested
3.9 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
4 March 2011
Agreement signed
4 April 2012
Proposed online date
August 2012
Withdrawn
April 2011

Location

Marker shows the centre of Penobscot County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Penobscot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem