🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in ERCOT (Texas) — page 38

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,986447.3 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,986 requests · page 38 of 40
ProjectCapacityStatusLocationRegionQueuedOnline
Lueders Solar
Solar · Innovative Solar 75
40.0 MWIn study Haskell, TXERCOT Jul 2017target 2028
Tain Solar
Solar · Abei Energy Green VII LLC
37.5 MWIn study Caldwell, TXERCOT Dec 2020target 2027
Delaware Ranch Solar
Solar · Delaware Ranch Solar, LLC
36.0 MWAgreement signed Culberson, TXERCOT Dec 2020target 2026
Blanket Ranch South Storage
Solar + storage · Blanket Ranch South Solar, LLC
34.3 MWIn study Brown, TXERCOT Jun 2022target 2028
Rocinante BESS
Solar + storage · Brush Country Solar Project, LLC
33.2 MWAgreement signed Gonzales, TXERCOT Apr 2021target 2027
Eagle Springs Storage
Solar + storage · Eagle Springs Solar, LLC
33.1 MWAgreement signed Delta, TXERCOT Oct 2021target 2026
Ty Cooke
Gas
33.0 MWPaused / redesign Lubbock, TXERCOT Aug 2020target 2021
Hecate Solar
Solar · Hecate Energy
33.0 MWPaused / redesign Brewster, TXERCOT Mar 2015target 2020
Weathervane Storage SLF
Battery storage
32.5 MWPaused / redesign Montague, TXERCOT Aug 2023
Capricorn I & III repower
Onshore wind · Nextera
32.0 MWAgreement signed Sterling, TXERCOT Mar 2017target 2026
Meridian BESS
Battery storage · Navitas Energy- Meredian BESS
31.2 MWIn study Bosque, TXERCOT Mar 2023target 2027
Lager Storage
Battery storage · Momentum Lager LLC
31.1 MWIn study Nueces, TXERCOT Feb 2022target 2028
Hooper Storage
Solar + storage · BT Brown Solar, LLC
30.7 MWIn study Lee, TXERCOT Dec 2022target 2027
M-Bar Solar I
Solar + storage · M-Bar Energy I, LLC
30.2 MWIn study Ector, TXERCOT Dec 2024target 2028
Half Moon Battery
Battery storage
30.2 MWPaused / redesign Hidalgo, TXERCOT Sep 2018
Pitts Dudik II
Solar · Pitts Dudik II
30.2 MWAgreement signed Hill, TXERCOT Jul 2022target 2026
Spinel Solar
Solar
30.0 MWPaused / redesign Medina, TXERCOT Aug 2017
Enchanted Rock NEWPP
Gas · Generate ER-NG, LLC
30.0 MWAgreement signed Harris, TXERCOT Nov 2021target 2026
Hillboro Wind
Wind + storage · Abei Energy Green XI LLC
27.8 MWIn study Hill, TXERCOT Jul 2024target 2028
Zeus Rusk Solar
Solar + storage · Rusk Solar, LLC
26.8 MWIn study Rusk, TXERCOT Mar 2024target 2027
Fowler Ranch Storage
Battery storage · Crane BESS, LLC
26.1 MWIn study Crane, TXERCOT Jun 2021target 2027
NET Power Demonstration plant
Gas · NET Power LLC
25.5 MWIn study Harris, TXERCOT Dec 2023target 2027
Kennedy Storage
Solar + storage · Kennedy Bypass Solar LLC
25.3 MWIn study Navarro, TXERCOT Jul 2022target 2028
Burro Loco Energy Storage
Battery storage · VESI
25.1 MWIn study Cameron, TXERCOT Jul 2022target 2026
Fluorite Solar
Solar
25.0 MWPaused / redesign Uvalde, TXERCOT Aug 2017
Knickerbocker Storage
Other · Knickerbocker Solar LLC
25.0 MWPaused / redesign Tom Green, TXERCOT Dec 2019target 2028
Hayhurst Texas Solar
Solar · Hayhurst Texas Solar, LLC
24.8 MWAgreement signed Culberson, TXERCOT Aug 2020target 2025
CPS Energy AvR1CT2 Rotor Replacement
Gas · CPS Energy
23.2 MWIn study Bexar, TXERCOT Oct 2023target 2025
Brazos Wind Repower
Onshore wind · BRAZOS WIND VENTURES, LLC
22.4 MWIn study Scurry, TXERCOT Dec 2020target 2025
Brandon
Gas
21.0 MWPaused / redesign Lubbock, TXERCOT Sep 2018target 2021
Wise County Power Repower (CT1, CT2)
Gas · Wise County Power Company LLC
21.0 MWAgreement signed Wise, TXERCOT Jul 2019target 2026
Sparkl BESS
Battery storage
20.0 MWPaused / redesign Guadalupe, TXERCOT Dec 2019
Basalt Solar
Solar
20.0 MWPaused / redesign Uvalde, TXERCOT Jul 2017
Shannon Wind Repower
Onshore wind · Shannon Wind, LLC
18.5 MWIn study Archer, TXERCOT Feb 2024target 2027
Buzzi Maryneal Wind Project
Onshore wind · Buzzi Unicem USA
18.0 MWIn study Nolan, TXERCOT Oct 2023target 2026
Midlothian 4 repower
Gas · MIDLOTHIAN ENERGY, LLC
18.0 MWIn study Ellis, TXERCOT Apr 2021target 2026
Midlothian Unit 2 repower
Gas · MIDLOTHIAN ENERGY, LLC
18.0 MWIn study Ellis, TXERCOT Jan 2021target 2026
Hays Energy Unit 2 Repower
Gas · HAYS ENERGY, LLC
18.0 MWIn study Hays, TXERCOT Feb 2022target 2026
Hays Energy Unit 3 Repower
Gas · HAYS ENERGY, LLC
18.0 MWIn study Hays, TXERCOT Oct 2020target 2026
Midlothian Unit 3 repower
Gas · MIDLOTHIAN ENERGY, LLC
18.0 MWIn study Ellis, TXERCOT May 2021target 2026
Greater Bryant G Solar
Solar · Greater Bryant G Solar, LLC
17.7 MWAgreement signed Midland, TXERCOT Jun 2021target 2026
Clutch City Storage I SLF
Battery storage
16.6 MWPaused / redesign Galveston, TXERCOT Nov 2022
Texas Gulf Sulphur Repower
Gas
16.1 MWPaused / redesign Wharton, TXERCOT Jul 2023
Anchor Wind III
Onshore wind · RANCHLAND WIND PROJECT LLC
16.0 MWAgreement signed Eastland, TXERCOT Dec 2021target 2025
Air Products GCA
Gas · Air Products
14.0 MWAgreement signed Galveston, TXERCOT Jun 2018target 2025
Stephens Ranch Wind Repower
Onshore wind · Stephens Ranch Wind Energy, LLC
12.4 MWIn study Borden, TXERCOT Jun 2023target 2027
Clutch City Storage II SLF
Battery storage
11.3 MWPaused / redesign Brazoria, TXERCOT Feb 2023
CPS AvR CT1 Rotor Replacement
Gas · CPS Energy
11.3 MWIn study Bexar, TXERCOT Oct 2022target 2025
Panther Creek 1 Repower
Onshore wind · Panther Creek Wind Farm I&II, LLC
11.0 MWIn study Glasscock, TXERCOT Jun 2023target 2026
Mirage
Gas
11.0 MWPaused / redesign Harris, TXERCOT Feb 2015
Page 38 of 40

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)